Hi,
I have a PDS valid from 01.01.2014 until 31.12.9999, but my operation was split between 01.01.2014 until 31.12.2014 and 01.01.2015 until 31.12.9999. This PDS was successfully CIFed and reflected in APO, but during heuristic run the order is created on the first operation while latter operation is not found and cause error.
This scenario seems to be valid in R3 but I'm not sure if APO currently support this.
Hope you can give me ideas to make this scenario work.
Thanks