APO Schedule lines not updated in ECC
Hi, Currently working on Procure to stock scenario in SPP. 1) Created SA in ECC and CIF to APO2) After DRP run schedule lines are created and the same are not getting updated in ECC. Regards,Harshad M.
View ArticleSPP- DRP - Supersession - Predecessor net demand not rolled up to successor
HI In SPP - DRP, if a product is in supersession , the predecessor products' net demand is not getting rolled up to the successor product. If for example, Product A is being superseded by Product B, if...
View ArticleProcurement type not updating in APO.
I have changed Procurement type 'E' to 'F' in ECC. but not getting updated in APO, i cif the material using tcode CFM1 and CFM2. I need a help to solve this issue.
View ArticleChange Total Demand KF in SNP by material
Hello All: I have a requirement where the request is to have just forecast and dep. demand to be part of Total demand KF in SNP. Also this will not have any forecast consumption. The above request is...
View ArticleHow to configure CVC automation process using SNP master data and BI customer...
Hi Gurus,How to configure CVC automation in MPOS structure technically, using SNP master data in CVC creation such as Product and location details and in parallel extract date from ECC to BI customer...
View ArticleTwo APO systems connected to one ECC system
Hi, We are trying to figure out if it is possible to connect to APO systems to an ECC systems. We are facing CIF-ing issues with respect to transaction data in such a scenario (using the same set of...
View ArticleOrder missing at planning board APO
Hello Expert, we unable to find some orders at planning board APO, even that order released from R3. Is there any way to get order at PB. I checked my time zone and set it as a local time zone. kindly...
View ArticleAPO to JDA S&op connectivity
can anyone share their experience in integrating APO with JDA Sales and operations planning tool for the items below so that files generated in APO can be pushed to JDA Sales and operations staging (...
View ArticlePurchase Reqs Generated to maintain Safety Time
Hello Experts,Another question.Have maintained a safety time on a material of 12 days supply. We are running SNP Heuristics and system is creating purchase reqs, however the reqs are not being created...
View ArticleProduct transportation lane doesnt exists or not found in database tables
Hi all, Im tryng to create quotas in the system using a custinm program and std BAPI.I see the below error for some of the entries: Product transportation lane doesnt exists or not found in database...
View ArticleResult of the VMI SNP calculation impacts our internal SNP calculation
Hi We´re running VMI with a customer in a separate VMI SNP Planning Area, and when running the Heuristic the result impacts our own internal SNP calculation even though our own internal SNP is...
View ArticleBackward Consumption Period different in ECC vs APO
Hi We are facing an issue with consumption of forecast in APO. The product master "Backward/Forward Consumption Period" is CIF´ed from ECC system. The problem is that 30 days is not necessary the same...
View ArticleAPO SNP Planning Book Show Product View alternative UoM
Hi, I have a base UoM of BTL and an alternative UoM of CAS. I can change/save in my users settings the in transactions /SAPAPO/RRP3 (Product View) and /SAPAPO/SDP94 (Planning Book) to show the...
View ArticleTime phase Min/max replenishment models for future dates
Hi, We are working on a safety stock requirement of Maximum/Minimum replenishment model in APO.It seems to work great except it cannot be time phased. Our business wants different safety stock...
View Articlefiscal calendars in time series
we are using fiscal year variant for calendars where year start with November 25 and ends with November 24th with 12 periods.Trouble is now we are having time bucket profiles where period considered...
View ArticleProcess in restarting a FRP-run: how to prevent incorrect analytics data
Hi, Today we encountered an issue where stock-data where not transfered to F&R. As a result OrderProposals generated during FRP-run were based on incorrect stock stock-values. As a result also the...
View ArticleCTM Generates Late SNP Planned Orders
Hi, I have the following scenario where CTM is generating Late SNP Planned orders (~ 82 days late) even though there is available capacity starting today on all resources ( valid -30 days +180 Days,...
View Articlepriority to resource in apo
Dear Expert I Have multiple PDS but I want to get only default PDS when Planning run takes place How to get it other than directly assigning priority in PDS Curto_simu . Is there any other way...
View ArticleAPO: Order does not exist
Dear experts, I have a scenario where the Sales Order is not updating to APO.I cannot see any sales order in RRP3 screen. The IM is active for sales orders. But i can see the queues stuck with error...
View ArticleUnable to update PDS to APO
Hi all, i want to CIF PDS from ECC ot APO. I use CF1 and CF2. as well as RIMODINI. But still it is not updating to APO. I need solution what wrong in it. regards, subhash waydande
View Article