Email alerts for a Process chain

$
0
0

Hi Experts,

 

We have maintained a message alert in the last step of process chain to send a mail alert after PC runs to success.

 

However, system is also sending us all log related to the variant in which email alert is setup.

 

Is there any way we can setup email alert on Process chain where system should send email notification once PC ran to success.

 

Tried checking forums, but ended in more confusion.

 

TIA


How to change the background color for just weekend to grey?

$
0
0

Hi,

 

I want to write a macro which can calculate the weekends and also change the background color for just the weekend to grey for Daily Planning view in SNP planning book.

 

Can anyone please suggest something?

 

Am attaching the macro which I wrote to calculate the working days, please let me know if its the correct way, to go about this issue

 

Thanks

Shruti

Different dates for downtimes while CCR of Maintenace Order

$
0
0

Dear Experts,

 

Please check the below issue which we are facing while integrating SAP PM with SAP APO for Resource Breakdown allocation.

 

Following Steps I have performed as per the instruction which I received from the discussion thread SAP APO <> SAP PM Integration from SCN.

 

Which was very helpful for understanding the concept.

 

However we are facing issue while doing CCR of Maint. Orders with system throwing error codes number 664 : Order 00000XXXXXX: Different dates for downtime. Message No. /SAPAPO/CIF664

 

Has any one faced such issues before or whether I am missing out on any config prior to that.

 

Let me know if you want additional data from my end.

 

Regards,

 

Deep Dave

APO planningboard mouseover information

$
0
0

Dear all,

 

For the detailed scheduling planning board, we have two different profiles. In profile one, the mouseover is showing order description and start+end date.However, in profile two, it is showing the article number also - which I think is desirable. I would like to setup this the same for profile one.

 

Where is this behaviour maintained?

End date and start date determination (for TLB + requirements)

$
0
0

Good day all of you,

 

For both production requirements and shipping we face an interesting goal.

 

If a production order for one SKU is running from monday till thursday, TLB is calculating the availability date as the date where the goods are finished.

Not earlier than thursday, a proposal will be created to ship. However, in reallife, there's already lots of production ready on tuesday (and wednesday/thursday). Is there any way to cope with this situation? Instead of splitting the order in 5 pieces?

 

Same issue for looking at the requirements for this order. Seems like all the lower comp. requirements are needed on the start date.

Operations go missing when converting Planned Order into Production Order?

$
0
0

Hello Experts,

 

We are facing one issue in PP/DS, where sometimes when a planned order is converted to Production order the Operations are no more visible (see below) screenshot:

PlOrd_to_PrdOrd.png

 

 

 

Initially we thought it happens when there is a resource overload situation. But we found another product on the same resource was not having this problem, even when resource was overloaded.

 

Any ideas what might be behind this behavior?

 

Many Thanks,

Bhuvan Paliwal

Planning object not found error

$
0
0

Hi

 

We are getting this error for random product- locations.

I have tried all options

 

TS consistency check, planning area initialization, /SAPAPO/TS_LCM_REORG_SNP, /SAPAPO/TS_LCM_REORG, OM17


The issue is not getting resolved. Any inputs?


Thanks

hari

TS_GET / TS_SET macro

$
0
0

Hi

I need to copy time series data for  a product from Location A to location B. the data to be copied is for 52 weeks.

Since there is no standard way, I plan to use the TS_GET / TS_SET macro.

 

Can someone who has used this tell me how to write this macro.

 

thanks

Hari


How to copy all including master data in MVM ?

$
0
0

Dear Experts,

 

 

I wish to do some experimentation after copying all (  master data, that this and everything)  from 000  to 097.

 

from MVM, I have created 097

 

I drag and drop from 000  to 097 just like from tree structure in  "My Computer "but it is not reactive. rather passive.

 

Is there any workaround.??  the image illustrates better

 

Capture1.JPG

 

 

Thanks

 

Ohio

PO dates difference

$
0
0

Hello Experts,

 

 

There is a PO Availability  date difference in APO and R/3 system the procurement type is external

 

 

For the only one PO number there is a mismatch in Avail Date for remaining PO are fine  for particular  material

 

 

Example : APO 28.03.2016 in R/3 02.04.2016

 

 

Can any one suggest me what will be the reason.

 

 

Thank you

How to establish a perfect match ? (with demand and supply in CTM)

$
0
0

Dear Members,

 

In my CTM run -my objective function- the must have is  (demand-supply)  has to be  = 0

 

if it shows -4  or +4  then I have to elevate/ depreciate  the demand Or supply side proportionally to bring it to 0.

 

But in my case both demand and supply are very volatile , it doesn't stand stable for more than a week,

 

What change in settings do i do in CTM profile  so as to achieve a zero static state. ??   this  fig. illustrates better. I am into investigation now, would be

of help if you can get me some clues, from your background knowledge on this CTM subject.

notok.jpg

Rahul  Ohio

Safety Days Supply

$
0
0

Hi Experts,

 

Is it possible to plan the materials in Distribution center using CTM with Safety Day's supply maintained in Key Figure? From what I know safety stock planning is done at plant level. If yes, may I kindly ask the pre-requisites or requirements?

 

Thanks in advance.

 

Sincerely, Ria

Material xxxx not maintained in plant 0001

$
0
0

I get this error in the /sapapo/cq. There is a queue which gets blocked almost very frequently. Material not maintained in plant 0001. Actually plant 0001 is not defined for the particular material. The master data also didn't seem to have any inconsistency. In the particular plant 0001, there are no materials maintained. Kindly help me with the issue.

Are there any Planner Dashboards in SCM 7.03

$
0
0

are there any planner dashboards in SCM 7 EHp3 ?

SAP ECC x APO integration BY BAPI_RSSRVAPS_CHANGEMULTI ERROR cy_sy_native_sql_error

$
0
0

Hi, when i call this bapi BAPI_RSSRVAPS_CHANGEMULTI in ECC from APO, a short dump is generated and RFC status in the Livecache CONSOLE transaction /n/sapapo/om13 tab "Check" get = RED as attached.

 

I am from functional APO side, Please give me details of how to go ahaead with this problem.

 

 

 

Dump Deck

BAPI Dump.jpg

 

RFC Connections

LC Console.jpg

 

Thanks!


Master Data not loaded in Download Upload Livecache Data After Migration

$
0
0

Dear SAP Experts,

 

I have problem with Load Master Data step in section C.Upload. After import system done in new machine, i run program /SAPAPO/OM_LC_DOWNLOAD_UPLOAD to upload livecache data from sap database to livecache database. All steps before Load Master Data in section C. Upload was done successfully. When i clicked Load Master Data button, Information about load master data in operating client is started was appeared but after that, status of Load Master Data is still "liveCache does not yet contain master data".

 

There are 2 background job for this process. Both of them was completed successfully with 0/1s duration.

Background job 1

 

Background Job2

 

I have continued to next step until step 13 and the status of live cache still does not contain master data.

Is there any thing that i missed before i load master data?

 

Please help give me suggestion to fix this issue.

 

Thanks & best regards,

Husin

Setting up Alternate UoM as default in DP planning book

$
0
0

Hello Experts,

 

Following are my settings of planning area and key figure.

 

msdp_admin.PNG  keyfig_settings.PNG

 

I am trying to load shipment data in materials alternate uom by setting up alternate uom as default in data view user settings but it doesn't show up as per settings made. "EA" is the uom that is always see irrespective of the settings made. Please guide me as to what i could be missing to achieve the business requirement.

 

 

Best Regards

Kartik

Process chain logs are not updated when CTM profile fails

$
0
0

Hello APO Experts,

 

In SAP APO process chain logs are not being updated when CTM profile fails where as logs are correctly updated in transaction SLG1.

 

Could you please help how can I update the process chain logs?

 

Thanks and Regards,

Arif

Slack time I/O node missing in RRP3 live cache view (GT_IO)

$
0
0

Dear All,

 

For some sales order records when we see the Slack time I/O node data in GT_IO within RRP3 we aren't able to see the Slack time. I believe this time should be equivalent to the Availability date of the sales order.

 

But not sure why for most of the sales orders these appear fine and for some they do not appear. We have a dependent report that retrieves data based on this slack time and hence this bothers us.

 

 

lss

Multi-resource scheduling heuristic SAP_MULT_SCH problem

$
0
0

Hello Experts,

 

We have a business requirement to setup DS scheduling in a PP-PI scenario with multiple production lines(3) for one product. Every line has a separate production version with different production times (3 PDS).Every production version (PDS) has one operation with two phases (setup and produce).

 

So, we are trying to use the SAP_MULT_SCH heuristic but it's not working as planned. The heuristic is not rescheduling on alternate PDS when we have multiple orders on the same day. It is not returning any error/warning messages in the log.

 

Heuristic settings:

 

heuristic.jpg

 

Master recipe:

 

master recipe.jpg

 

DS planning board after heuristic:

DS planning board.jpg

 

Any help would be greatly appreciated!

 

Best Regards,

 

Hrvoje